Actions
User Story #1081
openIris Design Document
Start date:
12/19/2023
Due date:
01/01/2024 (about 16 months late)
% Done:
0%
Estimated time:
Subsystem:
Iris
Success Criteria:
V1.0 of the Iris design document is complete
Description
Includes optical analysis, sensor trade-off, prototype mechanical design (and how it meets the optical requirements), proposed electronics design, and future work (ex. planned testing)
No data to display
Actions