Project

General

Profile

Actions

User Story #1180

closed

Phase #715: Phase B: Preliminary Design and Technology Completion Activities

Epic #977: Preliminary Designs and ICDs

Feature #1151: Hyperion Hinge Preliminary Design

Feature #1152: Hyperion Hinge In House Preliminary Design

New Hinge Preliminary Design: Kevin

Added by Ben Harbarenko over 1 year ago. Updated about 1 year ago.

Status:
Closed
Priority:
Normal
Assignee:
Start date:
01/18/2024
Due date:
02/06/2024
% Done:

100%

Estimated time:
10:00 h
Spent time:
Subsystem:
Mechanical
Success Criteria:
Preliminary CAD of design delivered for review

Description

Responsible: @Kevin Liu
Accountable: @Ben Harbarenko
Consulted: @Ben Harbarenko, @Ethan Ledig , @Katrina Hamdon , @Alice Nguyen , @Sarah Keats
Informed: Mechanical Team

What: Generate a Hinge assembly concept in CAD. Hinge should fit within the limited volume and interface the satellite with the deployable solar panels. The envelope available to contain the hinges and the solar panels is shown in this image:

Note the 9mm x 84mm protrusions. With the inclusion of surface mount solar panels the available depth is actually closer to 7mm. This is the volume that the hinges must function within. Your concept must be spring loaded to deploy should the solar panels be unconstrained. Cost of manufacture for both in house, and outsourced will be considered in a future trade study. Deliver presentation of CAD design at MecE meeting.

Consider reviewing Ex2 CAD for hyperion hinge for reference on past design. The full satelite CAD may be found here: https://drive.google.com/drive/u/0/folders/1zw0Y4LhD7IkPOgsIkOr8FfsBMZjpWSua

This is a detailed design document for the past design:
https://docs.google.com/document/d/1CXjtnlCOI9ZgDuHZ-j_Es-M7oV87Fg4Ec86F1mfKNsQ/edit

Why: It is crucial that a traditional hinge design is prepared for integration of the satellite as it is currently assumed that this will be the design that flies.


Files

clipboard-202401181500-xwzxf.png (41.6 KB) clipboard-202401181500-xwzxf.png Ben Harbarenko, 01/18/2024 10:00 PM

Related issues 1 (0 open1 closed)

Copied from CUBICS - User Story #1179: New Hinge Preliminary Design: Abegail ClosedAbegail Gagelonia01/18/202402/06/2024

Actions
Actions #1

Updated by Ben Harbarenko over 1 year ago

Actions #2

Updated by Kevin Liu about 1 year ago

  • Status changed from New to In Progress
  • % Done changed from 0 to 100
Actions #3

Updated by Kevin Liu about 1 year ago

  • Status changed from In Progress to Feedback
Actions #4

Updated by Saksham Verma about 1 year ago

  • Status changed from Feedback to Closed
Actions

Also available in: Atom PDF