User Story #1216
closedPhase #715: Phase B: Preliminary Design and Technology Completion Activities
Epic #977: Preliminary Designs and ICDs
Feature #1178: Mass Model
Feature #1128: Mass Model Research
Mass Budget Update: Iris & DFGM
Description
Responsible: @Brandon
Accountable: @Ben, @Saksham
Consulted: @Ben, @Saksham, @Matthew, @Sam, @Dipesh Aggarwal
Informed: Mechanical Team
What:
Reach out to sub system team lead, and work together to populate and verify this mass budget document with Ex-Alta 3 components for the Preliminary Design Review (PDR): https://docs.google.com/spreadsheets/d/1Il7Kk25vSafTMIIROnqKp8JwfkxfXPPihbgZBXDLVzI/edit#gid=542951909
Please ignore the TRL (Test Readiness Level) column for now and do note that currently the maturity level for any component should not be higher than an E. A bounding box has the maturity level I
IMPORTANT:
- Do not forget to update the change log
- Follow the cell-type color convention¶
Why: The mass budget for EX3 hasn't been updated in a long time, and it is a requirement for PDR.
Files
Updated by Brandon Martens about 1 year ago
- Status changed from New to Feedback
- % Done changed from 0 to 100
Updated by Ben Harbarenko about 1 year ago
- Status changed from Feedback to Closed