Actions
Task #1329
closedTopic #1315: Boom General
Correct CAD For ADCS Mag
Start date:
01/21/2025
Due date:
02/10/2025
% Done:
50%
Estimated time:
1:00 h
Success Criteria:
Changes have been made and are in the main assembly
Phase:
C
Description
Who: Ronak
What:
What:
- Move the ADCS magnetometer towards the boom so there is no interference with the rib, and so that the screw underneath is not obstructed
- Move the boom towards the ADCS mag to maximize space for the sun sensor. For amount of clearance there should be between the linear track and the two magnetometers, maybe to start make each side of the linear track pin the same length (right now the ADCS magnetometer side is longer), and then keep the same amount of distance between the pin and the magnetometer. If this doesn't make sense let me know on slack and we can call about it. -Sam
Why: To avoid any interference and to make sure there is enough room for the sun sensor
Updated by Sam Leader 3 months ago
- Due date changed from 01/28/2025 to 02/04/2025
Updated by Sam Leader 3 months ago
- Due date changed from 02/04/2025 to 02/03/2025
Updated by Sam Leader 3 months ago
- Due date changed from 02/03/2025 to 02/10/2025
Actions