Task #1409
openPhase #1391: Phase C: Detailed Design
Topic #1407: Iris Detailed Design
Iris USB to Camera Module Integration & Testing
Status:
In Progress
Priority:
Normal
Assignee:
-
Start date:
06/19/2025
Due date:
06/25/2025 (24 days late)
% Done:
60%
Estimated time:
Subsystem:
Iris
Success Criteria:
USB to Camera Module testing is complete
Updated by Priya Manavalan about 1 month ago
- Due date set to 06/19/2025
- Start date changed from 06/25/2025 to 06/19/2025
- Follows Task #1408: Iris USB Cabling Design added