Actions
Task #1533
openTopic #1315: Boom General
In-House Vibration test plan for the DFGM assembly with saddle and burn wire
Start date:
06/21/2025
Due date:
% Done:
0%
Estimated time:
Success Criteria:
A completed Test Plan with success criteria
Phase:
D
Description
Who:
What:
Why:
Document Link: https://docs.google.com/document/d/1xcqcr54PV8oWNuqXKad73PlijpE0N2HjFk_k1J-f1h4/edit?usp=drive_link
Updated by Matthew Foran 24 days ago
Who:
What:A test plan for performing vibration testing on the in-house shaker table. The mechanical team will come up wtih the jig.
Why: To verify vibration simulations, ensure functionality of boom after vibration and verify burnwire can hold the boom.
Document Link: https://docs.google.com/document/d/1xcqcr54PV8oWNuqXKad73PlijpE0N2HjFk_k1J-f1h4/edit?usp=drive_link
Actions