Compliant Mechanism Concept Generation

Added by Ben Harbarenko over 1 year ago. Updated over 1 year ago.

Status:
Closed
Priority:
Normal
Assignee:
Start date:
10/16/2023
Due date:
11/14/2023
% Done:

0%

Estimated time:
30:00 h
Subsystem:
Mechanical
Success Criteria:
Design parameters established, 4 preliminary concepts generated, document everything!

Description

Responsible: Saksham, Jack, Ethan, Brandon, Aryan, Daniel
Accountable: Ben
Consulted: Ben, Mike
Informed: Tyler, Ben

What: Quantifiably establish design parameters for a compliant Hyperion hinge. Refer to the NRCSD-E (https://nanoracks.com/wp-content/uploads/Nanoracks-External-Cygnus-Deployer-E-NRCSD-IDD.pdf) page 13 for the volume envelope available for the satellite. Refer to Ex-Alta 2 CAD as the assumed structure the hinges will interface with (https://drive.google.com/drive/folders/1zw0Y4LhD7IkPOgsIkOr8FfsBMZjpWSua). Generate 4 preliminary compliant hinge deigns that satisfy the design parameters.

Why: If CAN RGX is successful in its proposal to SEDS we will be responsible for providing feasible hinge designs for testing. The timeline will be relatively short (they fly in August). So we must get the ball rolling on this task.

Actions #1

Updated by Ben Harbarenko over 1 year ago

  • Success Criteria changed from Design parameters established, 4 preliminary concepts generated to Design parameters established, 4 preliminary concepts generated, document everything!
Actions #2

Updated by Ben Harbarenko over 1 year ago

  • Project changed from CUBICS to Sprint 016
  • Status changed from New to In Progress
Actions #3

Updated by Ben Harbarenko over 1 year ago

  • Due date set to 11/14/2023
Actions #4

Updated by Ben Harbarenko over 1 year ago

  • Project changed from Sprint 016 to Sprint 017
Actions #5

Updated by Ben Harbarenko over 1 year ago

  • Project changed from Sprint 017 to Sprint 019
Actions #6

Updated by Ben Harbarenko over 1 year ago

  • Project changed from Sprint 019 to CUBICS
Actions #7

Updated by Ben Harbarenko over 1 year ago

  • Status changed from In Progress to Closed