Project

General

Profile

Spent time

Filters

Apply Clear

Hours: 2550:34

Project Date User Activity Issue Comment Hours
CUBICS 01/14/2024 Ben Harbarenko Design User Story #1139: Sprint 19 Administrative Work: Ben Created tasks pretaining to EPS trade and Icarus CAD 0:20 Actions
Sprint 019 01/14/2024 Ben Harbarenko Design User Story #1141: EPS Trade Study Bounding Box Model: NA Created Bounding Box for NA-EPS and standard PC-104 board. Both were co-planar on nadir face 1:30 Actions
CUBICS 01/14/2024 Dipesh Aggarwal Development User Story #1076: Writing Iris Preliminary ICD Documentation Completion of all sections except sections pertaining to mechanical design. 4:00 Actions
Sprint 019 01/14/2024 Deven Thaleshvar Design User Story #1130: Mass Budget Research: OBC 0:12 Actions
Sprint 019 01/14/2024 Deven Thaleshvar Design User Story #1130: Mass Budget Research: OBC 0:42 Actions
Sprint 019 01/13/2024 Aryan Lakhani Development User Story #1135: CNC Mill Shadowing: Aryan 3:30 Actions
Sprint 019 01/12/2024 Aryan Lakhani Development User Story #1134: CNC Mill Shadowing Preperation: Aryan 0:30 Actions
CUBICS 01/12/2024 Jack Fraser Design Feature #1137: Compliant Mechanism Design and Manufacturing Jack's Mechanism Prototype 2:00 Actions
Non-Technical 01/12/2024 Aaron Berhane Development Feature #670: Aaron's Emails+Work tracker catchup for winter sem 1:15 Actions
Sprint 019 01/12/2024 Deven Thaleshvar Design User Story #1130: Mass Budget Research: OBC first revision of document 0:30 Actions
CUBICS 01/12/2024 Ben Harbarenko Design User Story #1139: Sprint 19 Administrative Work: Ben 0:30 Actions
CUBICS 01/11/2024 Ben Harbarenko Design User Story #1139: Sprint 19 Administrative Work: Ben 1:00 Actions
CUBICS 01/11/2024 Ben Harbarenko Design User Story #1139: Sprint 19 Administrative Work: Ben 1:00 Actions
Sprint 019 01/11/2024 Ben Harbarenko Design User Story #1118: Check Requirements Due for PDR Listed Requirements which must be satisfied by PDR. (1. Rail interface, 2. Coordinate system, 3. rail hardness) 0:12 Actions
CUBICS 01/10/2024 Ben Harbarenko Design User Story #1139: Sprint 19 Administrative Work: Ben 2:00 Actions
Sprint 019 01/10/2024 Kevin Liu Design User Story #1129: Mass Budget Research: ADCS Reached out to Ryan, awaiting response 0:12 Actions
Sprint 019 01/09/2024 Ben Harbarenko Design User Story #1133: Shaker Table Hardware Acquisition Preliminary Roadmap Completed doc: https://docs.google.com/document/d/1Ho2JlnsNOmqFBi299c7t5Z8rWJxcY5FLZ6u_ChvbHRs/edit 5:00 Actions
Sprint 017 01/09/2024 Ben Harbarenko Design User Story #944: Generate toolpath for Icarus ribs 6:00 Actions
Sprint 019 01/09/2024 Ryan Bererton Development User Story #1043: Complete Simulation Document for CubeSpace The info was sent to CubeSpace and the proposal will hopefully be received this week, along with the education discount. 2:00 Actions
CUBICS 01/09/2024 Dipesh Aggarwal Development User Story #1076: Writing Iris Preliminary ICD Documentation Populated sections of the preliminary ICD and met with Noah and Liam for further discussion. 2:30 Actions
CUBICS 01/03/2024 Dipesh Aggarwal Development User Story #1073: Wrap up Iris Subsystem Requirements 2:00 Actions
Sprint 019 12/25/2023 Nabiha Saghar Development User Story #1070: Optimize SWIR Optical Lens Design two doublets, trying to correct abberations, spot size is down to 15-19 avg. stay tuned for more improvements 3:00 Actions
Sprint 019 12/25/2023 Ryan Bererton Development User Story #923: Trade Study CubeSpace Filled out a few sections of the trade study document, gathering info for the rest of the sections. 3:00 Actions
Sprint 017 12/25/2023 Ryan Bererton Development User Story #954: Review ADCS Requirements Requirements have been sent to AlbertaSat advisors for comment. Once Dr. Barczyk has also reviewed the requirements, a separate task will be opened for another round of review. 1:00 Actions
Sprint 017 12/25/2023 Ryan Bererton Development User Story #1078: Requirements Review The requirements were reviewed and prepped for advisor feedback. Once Dr. Barczyk has been contacted and he has looked at the requirements, a separate task will be opened to go over his feedback. 2:00 Actions
(301-325/925) Per page: 25, 50, 100

Also available in: Atom CSV