Actions
User Story #1071
closedPhase #715: Phase B: Preliminary Design and Technology Completion Activities
Epic #977: Preliminary Designs and ICDs
Feature #1028: Preliminary Design: Iris
Feature #1013: Preliminary ICD: Iris
Testing of the Pi Compute Module 4 Power Draw
Start date:
11/29/2023
Due date:
12/12/2023
% Done:
0%
Estimated time:
4:00 h
Subsystem:
Iris
Success Criteria:
Successful determination of power draw on Compute Module 4.
Description
To test the validity of using a compute module 4 as the Iris daughter board, tests need to be done to determine if the Pi can be operated at lower power draw than specified for nominal operation. This test will feed directly into a feasibility analysis that can be documented in the Iris ICD.
Responsible: @Noah Klager
Accountable: @Dipesh Aggarwal, @Yeh-In Kang
Consult: @Dipesh Aggarwal, @Elliot Saive, @Liam Droog
Inform: @Dipesh Aggarwal
Updated by Dipesh Aggarwal over 1 year ago
- Project changed from CUBICS to Sprint 017
Updated by Dipesh Aggarwal over 1 year ago
- Project changed from Sprint 017 to CUBICS
Actions