General

Profile

Yeh-In Kang

  • Login: yehinkang
  • Registered on: 03/02/2023
  • Last connection: 03/06/2024

Issues

open closed Total
Assigned issues 4 6 10
Reported issues 3 5 8

Projects

Project Roles Registered on
CUBICS Team Lead 03/05/2023
Sprint 002 Team Lead 03/20/2023
Sprint 003 Team Lead 04/03/2023
Sprint 004 Team Member 05/02/2023
Sprint 005 Team Lead 05/16/2023
Sprint 006 Team Lead 05/30/2023
Sprint 007 Team Lead 06/13/2023
Sprint 008 Team Lead 06/27/2023
Sprint 009 Team Lead 07/11/2023
Sprint 010 Team Lead 07/25/2023
Sprint 011 Team Lead 08/08/2023
Sprint 012 Team Lead 08/22/2023
Sprint 013 Team Lead 09/05/2023
Sprint 014 Team Lead 09/19/2023
Sprint 015 Team Lead 10/03/2023
Sprint 016 Team Lead 10/31/2023
Sprint 017 Team Lead 11/19/2023
Sprint 018 Team Lead 12/18/2023
Sprint 019 Team Lead 01/09/2024
Sprint 119 Team Lead, Team Member 05/02/2023

Activity

01/31/2024

02:51 AM CUBICS Feature #1190 (In Progress): Iris housing PDR
Yeh-In Kang
02:33 AM CUBICS Feature #1190 (In Progress): Iris housing PDR
Have the housing polished up and integrated in Icarus by CDR.
Yeh-In Kang
02:38 AM Sprint 019 User Story #1191 (New): Iris mechanical structure cleanup
Cleanup the Iris mechanical design mostimportantly:
-Get structure fittign into Icarus nicely
-Clean up screwholes
...
Yeh-In Kang

01/15/2024

06:30 AM Sprint 019 User Story #1143 (New): Garage CNC Mill training
To obtain training on the CNC mills at the Elko engineering garage.
Follow the MCAM path and finish up to 2B.
Ass...
Yeh-In Kang

09/19/2023

04:07 AM CUBICS 6:00 hours (User Story #750 (Closed): Getting project scope defined for Mec E 409 design project)
This was completed way back before the letter of intent was written Yeh-In Kang

08/24/2023

06:21 PM CUBICS User Story #764 (Closed): Image Sensor Trade Study Analysis
Deliverable: To finish and review the trade study to determine the best candidates on hand for VNIR and SWIR sensors.... Yeh-In Kang
05:48 PM CUBICS User Story #750: Getting project scope defined for Mec E 409 design project
Deliverable: A complete document that outlines goals with subsections regarding different components with rough timel... Yeh-In Kang
05:38 PM CUBICS User Story #742 (Closed): VNIR image sensor datasheets into spreadsheet
Yeh-In Kang

08/22/2023

10:31 PM CUBICS User Story #750 (Closed): Getting project scope defined for Mec E 409 design project
Deliverable: A complete document that outlines goals with subsections regarding different components with rough timel... Yeh-In Kang
10:22 PM CUBICS User Story #452 (Closed): Finalize Iris Subsystem Requirements
Yeh-In Kang

Also available in: Atom