User Story #1123

closed

Phase #715: Phase B: Preliminary Design and Technology Completion Activities

Epic #977: Preliminary Designs and ICDs

Feature #1031: Preliminary Design: Icarus

Preliminary Stack Volume Budget

Added by Ben Harbarenko over 1 year ago. Updated about 1 year ago.

Status:
Closed
Priority:
High
Start date:
01/10/2024
Due date:
01/23/2024
% Done:

100%

Estimated time:
5:00 h
Spent time:
Subsystem:
Mechanical
Success Criteria:
Table outlining assumed required stack space based on tentative subsystem hardware selection

Description

Responsible: Brandon
Accountable: Ben
Consulted: Tyler, Ben, Former Mechanical team members
Informed: Mechanical Team

What: Generate a preliminary volume budget for Ex3 stack based on tentative sub-system component selection. Reach out to ADCS, Power, OBC, DFGM and Comms. Find out what components they have tentatively selected and what components will occupy space in the stack. Sum up the total required vertical space in the stack in order to accommodate the anticipated hardware. Use ex2 volume budget for reference:
https://docs.google.com/presentation/d/1UYb-Akej6n5bjXTnwY8fOomh8HPi-_ktEn3ejOLOoF4/edit#slide=id.g4bc89b36a4_3_21
Limit your work to the allocated 200mm stack area for now. Include a contingency for each A future task will expand on this.

Why: Volume budget is a deliverable for PDR

Actions #1

Updated by Ben Harbarenko over 1 year ago

  • Project changed from CUBICS to Sprint 019
Actions #2

Updated by Brandon Martens over 1 year ago

  • % Done changed from 0 to 100
Actions #3

Updated by Ben Harbarenko over 1 year ago

  • Project changed from Sprint 019 to CUBICS
Actions #4

Updated by Brandon Martens over 1 year ago

  • Status changed from New to In Progress
Actions #5

Updated by Ben Harbarenko over 1 year ago

  • Status changed from In Progress to Feedback
Actions #6

Updated by Ben Harbarenko about 1 year ago

  • Status changed from Feedback to Closed
Actions