Project

General

Profile

Actions

User Story #1164

closed

Phase #715: Phase B: Preliminary Design and Technology Completion Activities

Epic #977: Preliminary Designs and ICDs

Feature #1034: Preliminary Design: Thermal Model

Thermal Budget

Added by Ben Harbarenko over 1 year ago. Updated about 1 year ago.

Status:
Closed
Priority:
Normal
Start date:
01/22/2024
Due date:
02/05/2024
% Done:

100%

Estimated time:
3:00 h
Spent time:
Subsystem:
Mechanical
Success Criteria:
Document outlining thermal budgets completed

Description

Responsible: @Brandon Martens
Accountable: @Ben Harbarenko
Consulted: @Tyler Stocking , @Ben Harbarenko
Informed: Mechanical Team, Thermal Team

What: Determine max and min operational temperatures for each sub system. Emulate deliverable from ex2:

(Ask Tyler to locate and share the EX2 thermal budget)

Why: Required prerequisite for Ex3 thermal analysis

Actions

Also available in: Atom PDF