Feature #1293

open

Feature #1280: 8.3 Function: Subsystem Mechanical Integration

Feature #1290: 8.3.2 Feature: Mass Model

Feature #1292: 8.3.2.1 Activity: Mass Budgeting

Mass Model Revival

Added by Ben Harbarenko 12 months ago. Updated 12 months ago.

Status:
New
Priority:
Normal
Assignee:
Start date:
05/08/2024
Due date:
05/14/2024 (about 12 months late)
% Done:

0%

Estimated time:
4:00 h
Spent time:
Subsystem:
Mechanical

Description

Responsible: @Sarah Keats

Accountable: @Ben Harbarenko

Consulted: @Ben Harbarenko

Informed: mechanical team

What: Locate the mass budget in the drive and assess its present state. Ensure that there is a line item for ever component of the satellite based on the current CAD. Verify the current most recent values for the mass estimate of each component. Ensure that every mass estimate is sourced and justified. Reach out to responsible sub-systems as needed to verify values and obtain reference documentation. Identify next steps in progressing the maturity of mass budget and report next steps at the next mechanical meeting.

Why: Mass budget is required to track the total mass of the satellite on a system wide basis as the design matures. It is a tool to identify any failures to meet mass requirements and guide the design actively. Maintenance of this document is critical.


Related issues 1 (1 open0 closed)

Copied to CUBICS - Feature #1295: Volume Budget Revival NewEkjot Brar05/08/202405/14/2024