Project

General

Profile

Actions

Task #1309

closed

Topic #1308: Tape Spring Hinge

Rivet Prototype

Added by Sam Leader 4 months ago. Updated 3 months ago.

Status:
Closed
Priority:
High
Category:
Ex-Alta 3
Start date:
01/21/2025
Due date:
01/27/2025
% Done:

100%

Estimated time:
3:00 h
Success Criteria:
Tested the 2 types of rivets on both sides of the boom, attaching a tape spring on each side
Phase:
C

Description

Who: Deven, Matthew F, Matthew S
What:
  • Attach the tape springs to the aluminum tube using both types of rivets
  • See how much clearance there is inside the square tube when both sides are attached
  • Try and break the rivets by waving the boom around (be careful)

Why: To see if the rivets we've chosen are a viable solution to attach tape springs to the boom

Actions #1

Updated by Sam Leader 4 months ago

  • Blocks Task #1310: Update and Print Roller Design added
Actions #2

Updated by Sam Leader 4 months ago

  • Start date changed from 01/20/2025 to 01/21/2025
Actions #3

Updated by Sam Leader 4 months ago

  • Blocks deleted (Task #1310: Update and Print Roller Design)
Actions #4

Updated by Sam Leader 4 months ago

  • Description updated (diff)
  • Category set to Ex-Alta 3
  • Assignee changed from Sam Leader to Deven Thaleshvar
  • % Done changed from 10 to 0
  • Estimated time changed from 2:00 h to 3:00 h
  • Success Criteria changed from Tested rivet gun to attach tape springs to the aluminum tube to Tested the 2 types of rivets on both sides of the boom, attaching a tape spring on each side
  • Phase C added
Actions #5

Updated by Sam Leader 4 months ago

  • Description updated (diff)
Actions #6

Updated by Sam Leader 4 months ago

  • Status changed from New to In Progress
Actions #7

Updated by Sam Leader 3 months ago

  • Status changed from In Progress to Closed
  • % Done changed from 0 to 100
Actions #8

Updated by Sam Leader 3 months ago

  • Due date changed from 01/28/2025 to 01/27/2025
Actions

Also available in: Atom PDF