Actions
Task #1309
closedTopic #1308: Tape Spring Hinge
Rivet Prototype
Start date:
01/21/2025
Due date:
01/27/2025
% Done:
100%
Estimated time:
3:00 h
Success Criteria:
Tested the 2 types of rivets on both sides of the boom, attaching a tape spring on each side
Phase:
C
Description
Who: Deven, Matthew F, Matthew S
What:
What:
- Attach the tape springs to the aluminum tube using both types of rivets
- See how much clearance there is inside the square tube when both sides are attached
- Try and break the rivets by waving the boom around (be careful)
Why: To see if the rivets we've chosen are a viable solution to attach tape springs to the boom
Updated by Sam Leader 4 months ago
- Blocks Task #1310: Update and Print Roller Design added
Updated by Sam Leader 4 months ago
- Start date changed from 01/20/2025 to 01/21/2025
Updated by Sam Leader 4 months ago
- Blocks deleted (Task #1310: Update and Print Roller Design)
Updated by Sam Leader 4 months ago
- Description updated (diff)
- Category set to Ex-Alta 3
- Assignee changed from Sam Leader to Deven Thaleshvar
- % Done changed from 10 to 0
- Estimated time changed from 2:00 h to 3:00 h
- Success Criteria changed from Tested rivet gun to attach tape springs to the aluminum tube to Tested the 2 types of rivets on both sides of the boom, attaching a tape spring on each side
- Phase C added
Updated by Sam Leader 3 months ago
- Status changed from In Progress to Closed
- % Done changed from 0 to 100
Updated by Sam Leader 3 months ago
- Due date changed from 01/28/2025 to 01/27/2025
Actions