Actions
Task #1309
closedTopic #1308: Tape Spring Hinge
Rivet Prototype
Start date:
01/21/2025
Due date:
01/27/2025
% Done:
100%
Estimated time:
3:00 h
Success Criteria:
Tested the 2 types of rivets on both sides of the boom, attaching a tape spring on each side
Phase:
C
Description
Who: Deven, Matthew F, Matthew S
What:
What:
- Attach the tape springs to the aluminum tube using both types of rivets
- See how much clearance there is inside the square tube when both sides are attached
- Try and break the rivets by waving the boom around (be careful)
Why: To see if the rivets we've chosen are a viable solution to attach tape springs to the boom
Actions