Project

General

Profile

Actions

Task #1309

closed

Topic #1308: Tape Spring Hinge

Rivet Prototype

Added by Sam Leader 4 months ago. Updated 3 months ago.

Status:
Closed
Priority:
High
Category:
Ex-Alta 3
Start date:
01/21/2025
Due date:
01/27/2025
% Done:

100%

Estimated time:
3:00 h
Success Criteria:
Tested the 2 types of rivets on both sides of the boom, attaching a tape spring on each side
Phase:
C

Description

Who: Deven, Matthew F, Matthew S
What:
  • Attach the tape springs to the aluminum tube using both types of rivets
  • See how much clearance there is inside the square tube when both sides are attached
  • Try and break the rivets by waving the boom around (be careful)

Why: To see if the rivets we've chosen are a viable solution to attach tape springs to the boom

Actions

Also available in: Atom PDF