Actions
Task #1426
openPhase #1392: Phase D: Assembly, Integration and Testing
Topic #1485: Flight Model Assembly & Testing
TVAC Testing of FM
Status:
In Progress
Priority:
Normal
Assignee:
-
Start date:
10/13/2025
Due date:
10/13/2025 (Due in about 4 months)
% Done:
0%
Estimated time:
Subsystem:
Thermal
Success Criteria:
EX3 has been tested in the TVAC
Actions