Project

General

Profile

Actions

Task #1555

open

Topic #1315: Boom General

DFGM Ground Analysis

Added by Sam Leader 21 days ago. Updated 7 days ago.

Status:
In Progress
Priority:
Normal
Assignee:
Category:
Ex-Alta 3
Start date:
06/24/2025
Due date:
07/14/2025 (1 day late)
% Done:

0%

Estimated time:
Success Criteria:
Resistance table made
Phase:
D

Description

Who:
What:
  • Test the resistance between the linear track and the mounting plate with a multimeter
  • Check other pieces on the boom

Why: all metal parts on the satellite need to be grounded, so we need to make sure all the parts on the boom have a path to ground (a path to the mounting plate). Some of our parts need to be anodized for thermal and cold welding reasons, and electricity won't conduct through an anodized surface, so some of the paths are indirect. One of these parts is the linear track, and so we should see if there is enough contact between the linear track pins and the mounting plate to ground the linear track.

Actions #1

Updated by Sam Leader 21 days ago

  • Description updated (diff)
Actions #2

Updated by Sam Leader 21 days ago

  • Due date changed from 06/30/2025 to 07/07/2025
  • Category changed from N/A to Ex-Alta 3
  • Assignee set to Carson Mellow
Actions #3

Updated by Sam Leader 7 days ago

  • Due date changed from 07/07/2025 to 07/14/2025
Actions

Also available in: Atom PDF