Project

General

Profile

Actions

User Story #421

closed

Feature #18: ICARUS Redesign

Icarus Rib Configuration Analysis

Added by Tyler Stocking almost 2 years ago. Updated over 1 year ago.

Status:
Closed
Priority:
Normal
Start date:
05/04/2023
Due date:
05/15/2023
% Done:

0%

Estimated time:
25:00 h
Spent time:
Subsystem:
Mechanical
Success Criteria:
Completed design study and report summary

Description

Who: Ben (Full-time hire)

What: Perform a design study to determine the optimal rib configuration of Icarus.

Why: To determine what changes can be made to the Icarus structure to improve AI&T without compromising structure strength.

Actions #1

Updated by Tyler Stocking almost 2 years ago

  • Project changed from Sprint 004 to CUBICS
Actions #2

Updated by Tyler Stocking almost 2 years ago

  • Project changed from CUBICS to Sprint 005
Actions #3

Updated by Tyler Stocking almost 2 years ago

  • Project changed from Sprint 005 to CUBICS
  • Success Criteria set to Completed design study and report summary
Actions #4

Updated by Tyler Stocking almost 2 years ago

  • Project changed from CUBICS to Sprint 006
Actions #5

Updated by Tyler Stocking almost 2 years ago

  • Project changed from Sprint 006 to CUBICS
Actions #6

Updated by Tyler Stocking over 1 year ago

  • Status changed from New to Closed
Actions

Also available in: Atom PDF