Project

General

Profile

Actions

User Story #421

closed

Feature #18: ICARUS Redesign

Icarus Rib Configuration Analysis

Added by Tyler Stocking almost 2 years ago. Updated over 1 year ago.

Status:
Closed
Priority:
Normal
Start date:
05/04/2023
Due date:
05/15/2023
% Done:

0%

Estimated time:
25:00 h
Spent time:
Subsystem:
Mechanical
Success Criteria:
Completed design study and report summary

Description

Who: Ben (Full-time hire)

What: Perform a design study to determine the optimal rib configuration of Icarus.

Why: To determine what changes can be made to the Icarus structure to improve AI&T without compromising structure strength.

Actions

Also available in: Atom PDF