User Story #455

closed

Feature #190: Conduct Trade Study and Select an ADCS System

Narrow ADCS Options

Added by Ryan Bererton almost 2 years ago. Updated over 1 year ago.

Status:
Closed
Priority:
Low
Assignee:
Start date:
05/16/2023
Due date:
08/01/2023
% Done:

100%

Estimated time:
15:00 h (Total: 16:30 h)
Spent time:
6:00 h (Total: 7:00 h)
Subsystem:
ADCS
Success Criteria:
Have a list of three to four ADCS systems

Description

Who: CUBICS ADCS team
RACI:
Responsible: Ryan, Tom, and Spencer
Accountable: Ryan
Consulted: Andre, systems, PM
Informed: Andre, PM, systems, advisors

What: Using the NASA document for State-of-the-Art of Small Spacecraft Technology for GNC (https://www.nasa.gov/smallsat-institute/sst-soa/guidance-navigation-and-control#_Toc120697541) as a reference, narrow the list of possible ADCSs for ExAlta-3 to 3 or 4. Start with checking whether the system would meet our basic requirements, then narrow further from there.

Why: There are lots of options for small-sat ADCS systems available, but doing a full trade study including all of them would take too long. Narrowing the list first by eliminating the systems that do not meet our requirements will make the trade study conducted after much simpler. It will also give nice starting points to the research required for the trade study.


Subtasks 1 (0 open1 closed)

Sprint 009 - User Story #677: Finalize List of All ADCS Systems to be Considered for Ex-Alta 3ClosedRyan Bererton07/03/202307/14/2023

Actions
Actions #1

Updated by Ryan Bererton almost 2 years ago

  • Project changed from CUBICS to Sprint 005
Actions #2

Updated by Ryan Bererton almost 2 years ago

  • Success Criteria set to Have a list of three to four ADCS systems
Actions #3

Updated by Ryan Bererton almost 2 years ago

  • Project changed from Sprint 005 to CUBICS
Actions #4

Updated by Ryan Bererton almost 2 years ago

  • Project changed from CUBICS to Sprint 006
Actions #5

Updated by Ryan Bererton almost 2 years ago

  • Due date changed from 05/30/2023 to 06/13/2023
Actions #6

Updated by Ryan Bererton almost 2 years ago

  • Description updated (diff)
Actions #7

Updated by Ryan Bererton almost 2 years ago

  • Status changed from New to In Progress
Actions #8

Updated by Ryan Bererton almost 2 years ago

  • Project changed from Sprint 006 to CUBICS
Actions #9

Updated by Ryan Bererton almost 2 years ago

  • Project changed from CUBICS to Sprint 007
  • Due date changed from 06/13/2023 to 06/27/2023
  • % Done changed from 0 to 30
Actions #10

Updated by Ryan Bererton almost 2 years ago

  • Project changed from Sprint 007 to CUBICS
Actions #11

Updated by Ryan Bererton almost 2 years ago

  • Description updated (diff)
  • Due date changed from 06/27/2023 to 08/01/2023
  • % Done changed from 30 to 20
  • Project changed from CUBICS to Sprint 008
Actions #12

Updated by Ryan Bererton almost 2 years ago

  • Subtask #677 added
Actions #13

Updated by Ryan Bererton almost 2 years ago

  • Project changed from Sprint 008 to CUBICS
Actions #14

Updated by Ryan Bererton over 1 year ago

  • Priority changed from Normal to Low
Actions #15

Updated by Ryan Bererton over 1 year ago

  • Status changed from In Progress to Closed
Actions

Also available in: Atom PDF