Project

General

Profile

Actions

User Story #839

closed

Iris Demo User Guide

Added by Dipesh Aggarwal over 1 year ago. Updated over 1 year ago.

Status:
Closed
Priority:
High
Start date:
09/06/2023
Due date:
09/13/2023
% Done:

0%

Estimated time:
2:00 h
Spent time:
Subsystem:
Iris
Success Criteria:
Google doc user guide.

Description

A user guide or SOP is necessary to ensure successful operation of the Iris demo by any operator. As the Iris demo will be run primarily by members of the education outreach team, which itself will be taking on new members, having a standardized protocol for setting up and running the Iris demo is necessary.

Deliverable: Google document outlining the required materials, the setup procedure, and operating procedure for the Iris demo

Responsible: @Dipesh Aggarwal
Accountable: N/A
Consult: @Liam Droog
Inform: @Aaron Berhane

Actions

Also available in: Atom PDF