User Story #920
closedPhase #715: Phase B: Preliminary Design and Technology Completion Activities
Epic #968: Trade Studies and Concept Selection
Feature #822: Phase B - Component Planning
Fastener Drive Trade study
Start date:
10/21/2023
Due date:
12/05/2023
% Done:
0%
Estimated time:
3:00 h
Subsystem:
Mechanical
Success Criteria:
Rank order the fasteners with a pros and cons. List any specific restrictions.
Description
Responsible:
Accountable: Tyler
Consulted: Pundeep, Tyler
Informed: Systems
What: Determine which fastener drive type is the best for applying a preload torque.
Why: There were issues with the hex drive fasteners stripping last mission and we want to see if there are any better alternatives.
Updated by Ben Harbarenko over 1 year ago
- Project changed from CUBICS to Sprint 016
Updated by Ben Harbarenko over 1 year ago
- Project changed from Sprint 016 to Sprint 017
Updated by Ben Harbarenko over 1 year ago
- Due date set to 12/05/2023
EPS trade study for reference: https://docs.google.com/document/d/1TmwjKql_qV1b9x6yzFQZptrSai1eZ9AqX-aMNgHHViU/edit
Updated by Ben Harbarenko over 1 year ago
- Project changed from Sprint 017 to Sprint 019
Updated by Ben Harbarenko over 1 year ago
- Project changed from Sprint 019 to CUBICS