User Story #99
closed
- Project changed from CUBICS to 12
- Subsystem deleted (
Mechanical)
Who: Newer members (2)
What: Figure out if manufacturing in Elko can result in the same tolerances as outsourcing manufacturing. Considering bounding limits of the machine and component constraints.
How: Talking to the staff at Elko, find Ex-Alta 2 documentation and determine the tolerancing that was achieved through rapid cut. Look through CubeSat deployer documents (NanoRacks docs)
Maybe speak with Ethan
- Due date set to 03/21/2023
- Start date changed from 03/05/2023 to 03/07/2023
- Estimated time set to 10:00 h
- Subsystem set to Mechanical
- Project changed from 12 to CUBICS
- Project changed from CUBICS to Sprint 004
- Subject changed from Study of How Icarus Can Be Manufactured In-House to Study of How Icarus Can Be Manufactured In-House Part 1
- Assignee set to Ben Harbarenko
- Status changed from New to Closed