04/01/2023 Dipesh Aggarwal Development User Story #280: TVAC SOP and Thermal Testing Readings + Training Completed readings of SOPs and training (Apr. 1) 3:00 Actions
03/31/2023 Spencer Leaf Development User Story #168: ADCS Software Review EOS Tutorial with Andre 1:00 Actions
03/31/2023 Spencer Leaf Development User Story #168: ADCS Software Review 0:30 Actions
03/30/2023 Spencer Leaf Development User Story #238: Download and Configure EOS 0:30 Actions
03/30/2023 Ben Harbarenko Design User Story #146: Rail switch case study Compiled resources helpful to case study in appendix of document along with key findings from each. 1:30 Actions
03/28/2023 Tom Cundict Development User Story #238: Download and Configure EOS 0:30 Actions
03/28/2023 Spencer Leaf Design User Story #168: ADCS Software Review 0:45 Actions
03/28/2023 Ryan Bererton Development User Story #238: Download and Configure EOS Ryan installed and configured EOS in preparation for the tutorial. 1:00 Actions
03/27/2023 Ben Harbarenko Design User Story #146: Rail switch case study Started case study document. Wrote executive summary. Document structure in place https://docs.google.com/document/d/1gJ2Llb6YmVEcbmcPDdEVU9Csb-yV9Jw_fXWJA7xLhe4/edit#heading=h.4rwbnqcjoftl 0:30 Actions
03/25/2023 Tom Cundict Development User Story #169: ADCS Software Review 0:30 Actions
03/24/2023 Ben Harbarenko Design User Story #146: Rail switch case study 1:00 Actions
03/23/2023 Tyler Stocking Development User Story #196: Update TVAC generic board testing plan Updating the testing plan. Current state leaves lot to be desired therefore extra time will be required. 2:00 Actions
03/23/2023 Liam Droog Development User Story #219: Transpose matlab code to ipynb on the drive 1:30 Actions
03/21/2023 Tom Cundict Design User Story #169: ADCS Software Review 1:30 Actions
03/21/2023 Ben Harbarenko Design User Story #146: Rail switch case study Compiled reading material relevant to cube sat design requirements. Reviewed Ex-Alta 2 assembly plan 1:30 Actions
03/21/2023 Tyler Stocking Design User Story #124: Setup Solidworks workstation Determined procedure to create PDM server. 2:00 Actions
03/20/2023 Spencer Leaf Development User Story #168: ADCS Software Review 0:15 Actions
03/20/2023 Ryan Bererton Design User Story #160: Build ADCS backlog Only populated major tasks up to and including ordering ADCS 2:00 Actions
03/19/2023 Priya Manavalan Development Feature #87: Create Project Management Plan Created mission statement and mission objectives, completed schedule overview, internal organization, team roles and responsibilities and external relationships 4:00 Actions
03/10/2023 Tyler Stocking Development Feature #12: Mechanical Knowledge transfer Creation of a mechanical overview presentation for cubics to introduce new members to all of the aspects of the mechanical subsystem and the expected evolution during the cubics mission. 1:00 Actions