Project

General

Profile

Spent time

Filters

Apply Clear

Hours: 36:00

Project Date User Activity Issue Comment Hours
Sprint 019 02/07/2024 Noah Klager Design User Story #1166: Iris CM4 Custom PCB Design Started design specifications document, went over USB Hub datasheet determining how to implement the hub in the design. 2:00 Actions
Sprint 019 02/04/2024 Noah Klager Design User Story #1166: Iris CM4 Custom PCB Design Created project files; added CM4 and USB Hub too database; Started looking for Boost Converter parts 5:00 Actions
Sprint 019 01/31/2024 Dipesh Aggarwal Development User Story #1120: Research SNR Requirement Doing research, and making document. 10:00 Actions
CUBICS 01/16/2024 Dipesh Aggarwal Development User Story #1144: Iris SSAM Presentation Completed most of the SSAM presentation. 2:00 Actions
Sprint 019 01/15/2024 Nabiha Saghar Design User Story #1070: Optimize SWIR Optical Lens Design trying achromat asphere, and working to fix merit function to be fully functional to optimize the system 5:00 Actions
Sprint 019 01/15/2024 Nabiha Saghar Design User Story #1120: Research SNR Requirement gathered info, I have some equations to possibly discuss and use to find a new SNR value 2:30 Actions
CUBICS 01/14/2024 Dipesh Aggarwal Development User Story #1076: Writing Iris Preliminary ICD Documentation Completion of all sections except sections pertaining to mechanical design. 4:00 Actions
CUBICS 01/09/2024 Dipesh Aggarwal Development User Story #1076: Writing Iris Preliminary ICD Documentation Populated sections of the preliminary ICD and met with Noah and Liam for further discussion. 2:30 Actions
Sprint 019 12/25/2023 Nabiha Saghar Development User Story #1070: Optimize SWIR Optical Lens Design two doublets, trying to correct abberations, spot size is down to 15-19 avg. stay tuned for more improvements 3:00 Actions
    (1-9/9)

    Also available in: Atom CSV