Project

General

Profile

Spent time

Filters

Apply Clear

Hours: 114:30

Project Date User Activity Issue Comment Hours
CUBICS 05/15/2023 Ben Harbarenko Design User Story #421: Icarus Rib Configuration Analysis Fixed version of Ram rib. Started on Rails 3:00 Actions
CUBICS 05/08/2023 Ben Harbarenko Design User Story #421: Icarus Rib Configuration Analysis Completed simplified Icarus CAD. Ram and Ram middle ribs. Further issues with poor cad practices. Documented issues encountered 3:30 Actions
CUBICS 05/05/2023 Ben Harbarenko Design User Story #421: Icarus Rib Configuration Analysis Re modeled rails, anti-ram, anti-ram middle, and ram middle ribs for Icarus simplified. Ran into mistake in old icarus due to bad cad 6:00 Actions
CUBICS 05/05/2023 Ben Harbarenko Design User Story #421: Icarus Rib Configuration Analysis Re opened Simplified CAD of Icarus to find that the CAD had broken. Need to restart from ground up. I will be re building Icarus components from scratch to ensure simplicity 1:00 Actions
CUBICS 05/01/2023 Ben Harbarenko Design Feature #18: ICARUS Redesign Read Icarus Design documentation, Downloaded Ex-Alta2 Cad, investigated alternative configurations 1:30 Actions
Sprint 003 04/29/2023 Tyler Stocking Design User Story #285: CNC training Finished CAM Training 4:00 Actions
Sprint 003 04/04/2023 Tyler Stocking Development User Story #285: CNC training Finished basic mills 1A/1B 4:00 Actions
Sprint 003 03/30/2023 Ben Harbarenko Design User Story #146: Rail switch case study Compiled resources helpful to case study in appendix of document along with key findings from each. 1:30 Actions
Sprint 003 03/27/2023 Ben Harbarenko Design User Story #146: Rail switch case study Started case study document. Wrote executive summary. Document structure in place https://docs.google.com/document/d/1gJ2Llb6YmVEcbmcPDdEVU9Csb-yV9Jw_fXWJA7xLhe4/edit#heading=h.4rwbnqcjoftl 0:30 Actions
Sprint 003 03/24/2023 Ben Harbarenko Design User Story #146: Rail switch case study 1:00 Actions
Sprint 003 03/21/2023 Ben Harbarenko Design User Story #146: Rail switch case study Compiled reading material relevant to cube sat design requirements. Reviewed Ex-Alta 2 assembly plan 1:30 Actions
(26-36/36) Per page: 25, 50

Also available in: Atom CSV