Feature #1074
openPhase #715: Phase B: Preliminary Design and Technology Completion Activities
Epic #977: Preliminary Designs and ICDs
Feature #1028: Preliminary Design: Iris
Iris Preliminary Optics Design
Status:
New
Priority:
Normal
Assignee:
-
Start date:
11/29/2023
Due date:
01/09/2024 (about 16 months late)
% Done:
5%
Estimated time:
(Total: 53:00 h)
Spent time:
(Total: 20:30 h)
Subsystem:
Iris
Description
A feature to encapsulate all user stories associated with the completion of Iris preliminary optical designs for both the VNIR and SWIR lightpaths.