User Story #913
openPhase #715: Phase B: Preliminary Design and Technology Completion Activities
Epic #977: Preliminary Designs and ICDs
Feature #1028: Preliminary Design: Iris
Feature #1074: Iris Preliminary Optics Design
Populating Iris Optics Detailed Design Document
0%
Description
To supplement work being done towards the Iris preliminary ICD, and to also accelerate work for pre-CDR, an Iris optics detailed design document should be populated with all the information pertaining to the optics design of Iris. This includes information on the chosen bands (what they are, why they were chosen, etc.), image sensor trade study information, SNR and spatial resolution, and the Zemax designs (the design constraints, assumptions, workflow, etc.). This will enhance the information in the preliminary ICD, and also aid in the future development of a complete Iris detailed design document (which is a deliverable for Critical Design Review (CDR)).
Assigned to: Dipesh Aggarwal
Responsible: @Dipesh Aggarwal, @Yeh-In Kang
Accountable: @Dipesh Aggarwal, @Yeh-In Kang
Consult: @Liam Droog, @Elliot Saive
Inform: N/A
Updated by Dipesh Aggarwal over 1 year ago
- Project changed from Sprint 015 to Sprint 016
Updated by Dipesh Aggarwal over 1 year ago
- Due date changed from 11/07/2023 to 11/28/2023
Updated by Dipesh Aggarwal over 1 year ago
- Project changed from Sprint 016 to CUBICS
Updated by Dipesh Aggarwal over 1 year ago
- Description updated (diff)
- Due date changed from 11/28/2023 to 01/16/2024
- Parent task changed from #208 to #1074
Updated by Dipesh Aggarwal over 1 year ago
- Project changed from CUBICS to Sprint 017
Updated by Dipesh Aggarwal over 1 year ago
- Project changed from Sprint 017 to Sprint 018
Updated by Dipesh Aggarwal over 1 year ago
- Project changed from Sprint 018 to Sprint 019
Updated by Dipesh Aggarwal over 1 year ago
- Project changed from Sprint 019 to CUBICS
- Priority changed from High to Normal