Phase #715: Phase B: Preliminary Design and Technology Completion Activities

Epic #977: Preliminary Designs and ICDs

Feature #1028: Preliminary Design: Iris

Feature #1074: Iris Preliminary Optics Design

Populating Iris Optics Detailed Design Document

Added by Dipesh Aggarwal over 1 year ago. Updated over 1 year ago.

Status:
In Progress
Priority:
Normal
Start date:
10/10/2023
Due date:
01/16/2024 (about 16 months late)
% Done:

0%

Estimated time:
20:00 h
Subsystem:
Iris
Success Criteria:
Completed Iris Optics Design Document.

Description

To supplement work being done towards the Iris preliminary ICD, and to also accelerate work for pre-CDR, an Iris optics detailed design document should be populated with all the information pertaining to the optics design of Iris. This includes information on the chosen bands (what they are, why they were chosen, etc.), image sensor trade study information, SNR and spatial resolution, and the Zemax designs (the design constraints, assumptions, workflow, etc.). This will enhance the information in the preliminary ICD, and also aid in the future development of a complete Iris detailed design document (which is a deliverable for Critical Design Review (CDR)).

Assigned to: Dipesh Aggarwal

Responsible: @Dipesh Aggarwal, @Yeh-In Kang
Accountable: @Dipesh Aggarwal, @Yeh-In Kang
Consult: @Liam Droog, @Elliot Saive
Inform: N/A

Actions #1

Updated by Dipesh Aggarwal over 1 year ago

  • Project changed from Sprint 015 to Sprint 016
Actions #2

Updated by Dipesh Aggarwal over 1 year ago

  • Priority changed from Normal to High
Actions #3

Updated by Dipesh Aggarwal over 1 year ago

  • Due date changed from 11/07/2023 to 11/28/2023
Actions #4

Updated by Dipesh Aggarwal over 1 year ago

  • Project changed from Sprint 016 to CUBICS
Actions #5

Updated by Dipesh Aggarwal over 1 year ago

  • Description updated (diff)
  • Due date changed from 11/28/2023 to 01/16/2024
  • Parent task changed from #208 to #1074
Actions #6

Updated by Dipesh Aggarwal over 1 year ago

  • Project changed from CUBICS to Sprint 017
Actions #7

Updated by Dipesh Aggarwal over 1 year ago

  • Project changed from Sprint 017 to Sprint 018
Actions #8

Updated by Dipesh Aggarwal over 1 year ago

  • Project changed from Sprint 018 to Sprint 019
Actions #9

Updated by Dipesh Aggarwal over 1 year ago

  • Project changed from Sprint 019 to CUBICS
  • Priority changed from High to Normal