Project

General

Profile

Actions

User Story #308

closed

Feature #207: Iris MCR

Optical Configuration Research and Zemax Design

Added by Dipesh Aggarwal about 2 years ago. Updated almost 2 years ago.

Status:
Closed
Priority:
Normal
Start date:
03/21/2023
Due date:
07/25/2023
% Done:

0%

Estimated time:
16:00 h
Spent time:
Subsystem:
Iris
Success Criteria:
See deliverable.

Description

The goal of this task is to begin Ex-3 Zemax simulations by playing around with different optical configurations. The first step is to conduct a literature/internet search to find out which optical configurations, if any, have been used on Cubesat/nanosatellite platforms. If this information does not exist or is too difficult to find, expand the search to include small satellites and, if necessary, satellites in general; an example of a generally used optical design on satellites is a 3-mirror anastigmat telescope. The second step in this task is to pick some configurations that may be feasible on a Cubesat platform in 1U of physical space and, taking this size constraint into account, simulate these configurations in Zemax. At this point, optimization of the light paths is not necessary.

Deliverable: Zemax simulation files (.ZOS) that show different possible optical configurations for VNIR/SWIR.
Assigned to: @Connor McNeill (@Nabiha Saghar can support this)

Responsible: @Connor McNeill
Accountable: @Dipesh Aggarwal, @Yeh-In Kang
Consult: @Dipesh Aggarwal, @Liam Droog, @Elliot Saive
Inform: @Dipesh Aggarwal, @Yeh-In Kang

Actions #2

Updated by Dipesh Aggarwal about 2 years ago

  • Project changed from Sprint 003 to CUBICS
Actions #3

Updated by Dipesh Aggarwal about 2 years ago

  • Project changed from CUBICS to Sprint 004
Actions #4

Updated by Dipesh Aggarwal almost 2 years ago

  • Project changed from Sprint 004 to CUBICS
Actions #5

Updated by Dipesh Aggarwal almost 2 years ago

  • Priority changed from Normal to Low
Actions #6

Updated by Dipesh Aggarwal almost 2 years ago

  • Parent task set to #279
Actions #7

Updated by Dipesh Aggarwal almost 2 years ago

  • Subject changed from Optical Configuration Research to Optical Configuration Research and Zemax Design
  • Description updated (diff)
  • Due date set to 07/25/2023
  • Status changed from New to In Progress
  • Assignee changed from Nabiha Saghar to Connor McNeill
  • Priority changed from Low to Normal
  • Estimated time changed from 8:00 h to 16:00 h
  • Parent task changed from #279 to #207
  • Success Criteria set to See deliverable.
Actions #8

Updated by Dipesh Aggarwal almost 2 years ago

  • Project changed from CUBICS to Sprint 009
Actions #9

Updated by Connor McNeill almost 2 years ago

  • Status changed from In Progress to Closed
Actions #10

Updated by Dipesh Aggarwal almost 2 years ago

  • Project changed from Sprint 009 to CUBICS