Description
The purpose of this task is to revisit the optical simulations for Ex2 Iris within Zemax and to verify the accuracy and validity of the results. The simulations should include the following aspects:
- The effects of different wavelengths on the optical performance of Iris.
- The impact of alignment errors and manufacturing tolerances on the optical quality of Iris.
Updated by Dipesh Aggarwal about 2 years ago
- Project changed from Sprint 003 to CUBICS
Updated by Dipesh Aggarwal about 2 years ago
- Project changed from CUBICS to Sprint 004
Updated by Dipesh Aggarwal almost 2 years ago
- Project changed from Sprint 004 to CUBICS
- Assignee changed from Yeh-In Kang to Liam Droog
Updated by Dipesh Aggarwal almost 2 years ago
- Priority changed from Normal to Low
Updated by Dipesh Aggarwal almost 2 years ago
- Due date set to 06/20/2023
- Assignee changed from Liam Droog to Nabiha Saghar
- Start date changed from 03/21/2023 to 06/06/2023
- Success Criteria set to Complete Zemax simulations.
Updated by Dipesh Aggarwal almost 2 years ago
- Project changed from CUBICS to Sprint 007
Updated by Dipesh Aggarwal almost 2 years ago
- Status changed from New to In Progress
Updated by Dipesh Aggarwal almost 2 years ago
- Project changed from Sprint 007 to CUBICS
Updated by Dipesh Aggarwal almost 2 years ago
- Due date changed from 06/20/2023 to 07/25/2023
Updated by Yeh-In Kang almost 2 years ago
- Project changed from CUBICS to Sprint 8
- Parent task deleted (
#279) - Subsystem deleted (
Iris) - Subgroup deleted (
Iris Optics)
Updated by Priya Manavalan almost 2 years ago
- Project changed from Sprint 8 to Sprint 008
- Subsystem set to Iris
Updated by Dipesh Aggarwal almost 2 years ago
- Project changed from Sprint 008 to CUBICS
Updated by Dipesh Aggarwal almost 2 years ago
- Project changed from CUBICS to Sprint 009
Updated by Yeh-In Kang almost 2 years ago
- Project changed from Sprint 009 to CUBICS
Updated by Dipesh Aggarwal almost 2 years ago
- Project changed from CUBICS to Sprint 010
Updated by Dipesh Aggarwal almost 2 years ago
- Due date changed from 07/25/2023 to 08/15/2023
- Priority changed from Low to Normal
Updated by Dipesh Aggarwal over 1 year ago
- Status changed from In Progress to Closed
Updated by Dipesh Aggarwal over 1 year ago
- Project changed from Sprint 010 to CUBICS