Actions
User Story #936
closedFeature #208: Iris CDR
Address MCR Feedback from CSA
Start date:
10/31/2023
Due date:
11/28/2023
% Done:
0%
Estimated time:
3:00 h
Subsystem:
Iris
Success Criteria:
Changes made to STM defining image quality, determine how sensitive optics are, and thermal isolaton
Description
Description
The goal of this user story is to address the comments from the CSA from MCR. Required changes need to be made to STM and detailed design documents.
Assigned to: @Connor McNeill
Deliverable: SolidWorks files and renders of Ex-3 Iris.
Responsible: @Connor McNeill
Accountable: @Dipesh Aggarwal @Yeh-In Kang
Consult: @systems
Inform: @pm
Actions