Actions
Feature #819
closedPhase #715: Phase B: Preliminary Design and Technology Completion Activities
Epic #977: Preliminary Designs and ICDs
Feature #1032: Preliminary Design: Hinges
Phase B - Deployable Research and Design
Status:
Closed
Priority:
Normal
Assignee:
-
Start date:
08/24/2023
Due date:
11/14/2023
% Done:
100%
Estimated time:
(Total: 60:00 h)
Spent time:
5:00 h (Total: 61:40 h)
Subsystem:
Mechanical
Description
This is the work relevant to the design of an initial prototype-compliant hinges, including research, rapid prototyping, CAD and manufacturing.
Actions