09/12/2023 Jack Fraser Development User Story #747: TVAC board holder design 3:00 Actions
09/11/2023 Ben Harbarenko Design User Story #848: Ben MCAM 2 Training Finished self guided part 1:00 Actions
09/11/2023 Dipesh Aggarwal Design User Story #837: CSA and GAM Filtering Presentation and Meeting 1:30 Actions
09/10/2023 Tyler Stocking Design User Story #753: Preliminary Mass Budget Created the excel sheet, everything is formatted next steps are to define the expected mass and the contingency. 4:00 Actions
09/09/2023 Dipesh Aggarwal Design User Story #837: CSA and GAM Filtering Presentation and Meeting 3:00 Actions
09/08/2023 Ben Harbarenko Design User Story #848: Ben MCAM 2 Training 1:30 Actions
09/08/2023 Ryan Bererton Development User Story #708: Justify ADCS Requirements The main block of justification is finished. If any more justification is needed, then it will be added as part of a separate task. 1:00 Actions
09/07/2023 Ben Harbarenko Design User Story #848: Ben MCAM 2 Training started self guided training 0:30 Actions
09/05/2023 Ryan Bererton Development User Story #786: ADCS- Internal MCR Presentation The presentation was given as part of internal MCR. Feedback is now being implemented. 2:00 Actions
09/05/2023 Priya Grewal Development User Story #694: Power Requirements 10:00 Actions
09/05/2023 Priya Grewal Development User Story #776: Power Requirements - Finalized for MCR 2:00 Actions
09/05/2023 Priya Grewal Development User Story #788: Power - Internal MCR Presentation 2:00 Actions
09/05/2023 Priya Grewal Development User Story #796: Power Risk Matrix 2:00 Actions
09/05/2023 Dipesh Aggarwal Development User Story #764: Image Sensor Trade Study Analysis 5:00 Actions
09/02/2023 Tyler Stocking Design User Story #774: Mechanical Requirements - Finalized for MCR We love requirements 4:00 Actions
08/31/2023 Ben Harbarenko Design User Story #763: DRA application 2:00 Actions
08/30/2023 Dipesh Aggarwal Design User Story #785: Payload - Internal MCR Presentation 1:00 Actions
08/30/2023 Tyler Stocking Design User Story #774: Mechanical Requirements - Finalized for MCR Finished requirements for Internal MCR, much more work needed for External MCR 5:00 Actions
08/30/2023 Ryan Bererton Development User Story #455: Narrow ADCS Options Manufacturers were contacted and some responses were received. Any other work on this topic will be moved into trade study tasks. 3:00 Actions
08/29/2023 Ryan Bererton Development User Story #684: Gather Questions for CubeSpace A list of questions were gathered that we can ask that relate to the ADCSs on the NS satellites and to EX3. More questions will inevitably be made as we conduct the trade study. No email was sent. 1:00 Actions
08/29/2023 Ryan Bererton Development User Story #455: Narrow ADCS Options Some of the ADCS systems were determined to be non-compatible, or the company simply didn't respond. 2:00 Actions
08/29/2023 Ryan Bererton Development User Story #662: Investigate CubeSpace ADCS Issues Got good answers from Alex about their issues with their ADCS. Nothing more needs to be done right now as this is only an issue for NS and not CUBICS. 1:00 Actions
08/29/2023 Ryan Bererton Development User Story #794: ADCS Risk Matrix Defined several risks in the matrix for ADCS. Reviewed them and their response plans for accuracy. Further refinement can happen in the future as necessary. 2:30 Actions
08/29/2023 Nabiha Saghar Design User Story #720: Zemax Dichroics Simulation used rescheck, document in notes outlines results, please lmk if you have questions! 1:00 Actions
08/29/2023 Ben Harbarenko Design User Story #787: Mechanical - Internal MCR Presentation 2:00 Actions