08/29/2023 Max Schatz Development User Story #806: Power - Review comments on requirements from internal MCR 2:00 Actions
08/29/2023 Max Schatz Development User Story #776: Power Requirements - Finalized for MCR 12:00 Actions
08/29/2023 Max Schatz Development User Story #788: Power - Internal MCR Presentation 2:00 Actions
08/29/2023 Max Schatz Development User Story #796: Power Risk Matrix 1:00 Actions
08/28/2023 Ben Harbarenko Design User Story #805: Mechanical - Review comments on requirements from internal MCR 2:00 Actions
08/28/2023 Sarah Keats Design User Story #749: Shaker Table 3U Mounting Solution: Preliminary Research Researched 2U shaker mount and requirements for a 3U equivalent 1:00 Actions
08/28/2023 Connor McNeill Design User Story #705: Testing of Multiband VNIR Filter 2:00 Actions
08/24/2023 Ben Harbarenko Design User Story #763: DRA application sent draft of form to mike for input 1:00 Actions
08/22/2023 Ryan Bererton Development User Story #708: Justify ADCS Requirements Finishing the calculations from Iris parameters and fixing miscellaneous errors 3:00 Actions
08/22/2023 Joanne Cai Design Feature #600: Communication Subsystems Requirements 10:00 Actions
08/22/2023 Yeh-In Kang Development User Story #452: Finalize Iris Subsystem Requirements Finished adding the requirements to the systems requirements doc 4:00 Actions
08/22/2023 Tyler Stocking Design User Story #722: Structure Brainstorming Had a group discussion about the structure needs and wants and possible designs that could be used as inspiration. 10:00 Actions
08/22/2023 Nabiha Saghar Design User Story #720: Zemax Dichroics Simulation verifying feasibility of single aperture BS configuration 4:00 Actions
08/18/2023 Ben Harbarenko Design User Story #763: DRA application 3:00 Actions
08/18/2023 Priya Manavalan Development User Story #128: Iris Requirements Definition - Finish 1st Draft 1:00 Actions
08/18/2023 Connor McNeill Design User Story #742: VNIR image sensor datasheets into spreadsheet 6:00 Actions
08/15/2023 Max Schatz Development User Story #666: First Power Budget Iteration 40:00 Actions
08/15/2023 Dipesh Aggarwal Design User Story #452: Finalize Iris Subsystem Requirements 2:00 Actions
08/15/2023 Dipesh Aggarwal Design User Story #665: Dipesh and Yeh-In Review Things 3:00 Actions
08/15/2023 Connor McNeill Design User Story #742: VNIR image sensor datasheets into spreadsheet 5:00 Actions
08/14/2023 Yeh-In Kang Development User Story #452: Finalize Iris Subsystem Requirements Time spent over the weekend 2:00 Actions
08/14/2023 Yeh-In Kang Design User Story #711: Learn Zemax 1:00 Actions
08/14/2023 Yeh-In Kang Development User Story #665: Dipesh and Yeh-In Review Things Meetings over the weekend + continued review 6:00 Actions
08/14/2023 Nabiha Saghar Design User Story #720: Zemax Dichroics Simulation Optical path with low mtf, working on making better, but Zemax is hard. Non sequential is gross and may not comply with some of these optimization/analysis methods listed in user story. 5:00 Actions
08/14/2023 Connor McNeill Design User Story #705: Testing of Multiband VNIR Filter 3:00 Actions